Cutting from The Chronicle of Suunian History and Culture
(Optional! Do not read if you don't care!)
5th Celop,Block 1, Vanus, 7——
Days
Incipmov
"start move"
Beginning of the week and labor at a moderate pace.
Celop
"fast labor"
The second day of the week has the most physical labor, but is the only day that one has to produce a large or set amount of product. This insures that sects can be provided for without shortage (and ideally with surplus).
Oplea
"snail work"
After Celop, worker's bodies tend to be sore and wish not to exert much force. Work can still be done, but at a lower rate than medium.
Relimed
"mid rest"
Day of rest in the middle of the week. Unless one chooses to for increased pay, the population of the sect are given a break from their labors. Often, they study or bury themselves in a secondary hobby.
Oparda
"slow work"
More labor is done at a faster pace than on Oplea, but not nearly as strict and demanding as in Celop.
Finus
"End time"
The last day of labor before another day of rest. Labor is similar to the pace of Incepmov.
Reli
"rest"
Unlike Relimed, every laborer has off for Reli. This prevents the misuse of workers and possible slavery.
Blocks
Block 1 and 2
Total of 12 weeks (2 5 blocks with 1 week of Mora)
Each season is split into two five week blocks with one week of Mora or respite. Each block follows the schedule of the week.
Mora 1 and 2
Each Mora week are part of blocks 1 or 2 depending on which they end. Mora is a week of respite that is granted to everybody. One must work through one Mora to keep the sect producing. Other total respites hurt the economy, so on respites that are not universal one can sign up for the Mora of their choice. If they do not sign up, the government will place them in an empty slot. If they try to go to work, their employers are encouraged to turn them down. Those on respite are not payed in full wages, but given enough to support themselves through the week.
Seasons
Floreo
84 days
The season of the bloom.
Flora prepare their fields and crops for Op and Meto. Water is most plentiful and floral displays and city/townscapes are often reformed and fixed.
Festival
A 15 day respite after Floreo Mora 2. The first five days are a celebration for the blooming of flowers. The last ten days are a universal respite.
Op
91 days
The season of labor.
Mostly farm work, infrastructure repair, traveling, and a time for the ICMS to meet and discuss the state of the sect. At the end of the season the inner circles from other Moon sects meet with her majesty.
Dormio 1
In the blistering heat of Op, Flora are given a respite after the first Mora. This hopefully protects the people of the sect from over working in intense heat without water. This is a universal respite.
Meto
84 days
The season of harvest.
Mainly farming and educational work.
Vanus
91 days
The barren season.
No farming or building can be done due to the weather. Mostly field work and institution work is done by the educated. The laborers are moved into warm locations to prepare meals or sew clothing.
Dormio 2
All Flora have a week respite after the first Mora of Vanus because the weather will not permit work to be done. It is cruel to force one to work under harsh weather conditions. This is a universal respite.
Violet Banksii
Comments (0)
See all